GlossaryData Lifecycle, Tiering, and MobilityData migration

Data migration

A data migration is a one-time move of data between storage systems, usually driven by a hardware refresh, a consolidation, or a move to the cloud. It has a start and an end, which is what separates it from mobility.

Key takeaways

  • A data migration is a one-time move between storage systems with a start and an end.
  • Planning starts with an index of the source, so only what is needed moves.
  • Chain of custody and a warm cutover reduce risk and downtime.
  • Nobody knows what is being moved, so waste is copied along with valuable data.
  • Permissions and owners break on the new system.
  • Applications point to old paths that no longer exist.
  • The schedule is wrong, because size and file counts were estimated, not measured.
  1. Index the source.
  2. Leave behind duplicates and data with no remaining use.
  3. Preview the move as a dry run.
  4. Move the rest in batches, with each file recorded in the catalog.

Chain of custody is the record that shows every file arrived at its destination complete and unchanged, and who moved it when. In practice it combines a list of files before the move, checksums compared after the copy, and a log of each step. It matters most for regulated, legal, or research data, where an organization may have to prove that a file is the same one that was created.

A warm cutover is a migration in which the source stays in use while data is copied, and a final short sync moves only what changed before users switch to the new system. It reduces downtime compared with a cold cutover, where the source is frozen for the whole copy. The trade-off is planning: changes during the copy must be tracked so the final sync is complete.

Diskover indexes the source before a migration, so your team can decide what to move, what to archive, and what to leave behind.

← Back to Data Lifecycle, Tiering, and Mobility

Last updated: November 13, 2026.

Scroll to Top