eGuide | Reclaim before you buy

The cheapest petabyte is the one you never buy.

How to find, price, and reclaim the storage you already own, before you pay 2026 prices for more.

Read the full guide.

All nine chapters, the cost worksheet, and the sprawl score are open to everyone.

Know what you own before you buy more.

Storage got scarce and expensive in 2026. The usual answer is to buy more, at the highest prices in years. This guide makes the case for a different first move: find out what you already own, put a price on what it costs to keep, reclaim the share no one needs, and set rules so the waste does not grow back.

  1. 01
    Storage stopped being cheap.
  2. 02
    Most of what you store, nobody opens.
  3. 03
    Storage is only the first line on the bill.
  4. 04
    Put a price on your waste.
  5. 05
    Score your sprawl.
  6. 06
    Reclaim before you buy.
  7. 07
    What good looks like.
  8. 08
    Build the case finance will sign.
  9. 09
    Questions people ask.
01
Chapter 1 | Why now

Storage stopped being cheap.

Demand is climbing, supply is committed, and prices have moved faster than budgets.

+80%
rise in enterprise SSD contract prices in Q1 2026 alone
+234%
forecast rise in NAND flash prices in 2026
100%
of Western Digital’s 2026 hard drive output is already committed
52+ wks
lead times for new nearline hard drives, up from a few weeks

Three forces met at the same time.

Demand keeps growing.

Gartner forecasts data center storage demand to grow 19.5% a year through 2029, and unstructured data already makes up 70% to 90% of what organizations hold. In a Seagate survey, 99% of IT leaders expect AI to increase their storage needs, and only 38% feel fully prepared.

Supply is spoken for.

Drive makers sold their 2026 output to hyperscale AI buyers. Nearline lead times grew from a few weeks to more than 52 weeks.

Prices moved on every tier.

Flash took the biggest jump, but disk did not escape: a 30TB hard drive went from $495 to $1,216 in one year. IDC expects no SSD price relief before 2028.

Price of a 30TB SSD, compared with a 30TB hard drive

A year earlierAugust 2026

Source: VDURA Flash Volatility Index, August 2026. The gap peaked at 23.2x in Q1 2026.

What this means

A 2026 refresh planned against 2024 prices no longer exists at that price. The capacity you order arrives next year. The capacity you reclaim is available this quarter.

What the forecasts say next
19.5%

yearly growth in data center storage demand through 2029, to 3.19 zettabytes (Gartner)

2027

flash shortages expected to last into the second half of the year (Gartner)

2028

the earliest year IDC expects any relief in SSD prices

02
Chapter 2 | Where the waste hides

Most of what you store, nobody opens.

The reclaimable share is rarely in one place. It is spread thin across every tier you pay for.

Measured, not estimated.

When CTERA scanned 856 file shares holding more than 16 PB, it found that 88.3% of files had not been opened in more than a year, and less than 10% of capacity had been touched in the last 90 days.

Some of that data must be kept for legal or research reasons. But it does not need to live on the most expensive tier, and a large share of it does not need to exist at all. A 2016 Veritas study put redundant, obsolete, and trivial (ROT) data at 33% of what organizations store.

Where to look first

Compare when a file was last modified with when it was last read. The gap between those two dates is where reclaimable capacity hides.

Six places the waste hides

Duplicates

Copies of the same file across shares, projects, and clouds, each one billed at full price.

A global advertising holding company found 39% of 1.6 PB of Amazon S3 storage was redundant, obsolete, or trivial.

Cold data

Files no one has opened in years, still sitting on fast, premium tiers.

88% of files had not been opened in over a year (CTERA).

Orphaned data

Files whose owners left the company, with no one left to say keep or delete.

88% of organizations still have enabled accounts for people who left (Varonis).

Abandoned AI output

Models, checkpoints, embeddings, and test runs left behind when a project moved on.

Gartner predicts organizations will abandon 60% of AI projects that lack AI-ready data.

Scratch and temporary files

Debug output, core dumps, render caches, and logs that were never cleared.

A Fortune 500 semiconductor company surfaced 1.9 PB of abandoned and ephemeral data.

Dark data

Data no one has classified, so no one knows its value or its risk.

36% of stored data is dark or unclassified (Ponemon).

03
Chapter 3 | What it really costs

Storage is only the first line on the bill.

Unmanaged data costs money in five places. Each one sits in a different budget, so the total belongs to no one.

1

Storage

You pay 2026 prices to keep capacity filled with files no one reads. Every refresh is sized by what you hold, not by what you use.

+145%rise in the price of a 30TB hard drive in one year (VDURA)
2

People

Without one view across storage, every search and every cleanup is manual. Teams lose time hunting for files, recreating the ones they cannot find, and doing manually what a policy could do on its own.

25%of team time is lost to searching for answers (Atlassian)
3

Cloud

Moving data to the cloud without knowing what it is moves the waste too, and the fees follow it.

49%went over their cloud storage budget in 2025; fees are 50% of spend (Wasabi)
4

Risk

You cannot protect or delete what you cannot find. Only 34% of organizations know where all their data is (Thales).

$4.99Mglobal average cost of a data breach (IBM, 2026)
5

AI

AI pipelines copy and transform data at every step, which multiplies every other cost on this page.

60%of organizations saw storage and compute costs push AI projects over budget (Snowflake)
The hidden multiplier

Individually, each cost looks manageable. Together, they grow every quarter the data is left alone.

Weak data foundations waste $108 billion in AI investment each year, according to Hitachi Vantara.

04
Chapter 4 | Worksheet

Put a price on your waste.

Ten minutes, six numbers, and one total you can take to finance.

You do not need a perfect number to start. You need a defensible one. The worksheet opens with a worked example. Replace each value with your own figures, and the totals update as you type.

Want a quick estimate first?Try the Cost of Data calculator →

Enter your own numbers in the white boxes. The example shows the method, not a benchmark. For B, it uses storage prices only.

A
Total capacity of your data estate
Every tier: NAS, object, cloud, archive.
PB
B
Fully loaded cost per PB per year
Include hardware, support, power, backup copies, and admin time. Not sure? Calculate your own storage cost below.
$
C
Reclaimable share
Start with 30%. Diskover customers reclaim 30% to 50% of their storage by tiering and removing ROT.
%
D
Yearly cost of reclaimable data
A × B × C
$190,425
E
Hours lost to manual data management
Number of people who search for, move, or clean up files manually × hours each spends per week. Without automation, this work comes back every week.
×
hrs
$
Hourly cost of their time
Fully loaded hourly cost of the people in E.
$
F
Yearly cost of people’s lost time
40 hrs × $75 × 52 weeks
$156,000

Not sure about B? Build it from your storage tiers.

Your cost per PB is an average of what each tier costs, weighted by how much data sits on it. Enter the PB on each tier and what each tier costs you per PB per year. The starting prices are the industry averages behind the Diskover Cost of Data calculator. See where these numbers come from. Replace them with the prices on your own invoices and contracts.

Storage tierPB on this tierCost per PB per yearYearly cost
Total0 PB$0
per PB
$0

Starting prices are storage costs only. To make B fully loaded, add support contracts, power and cooling, backup copies, and admin time.

05
Chapter 5 | Self-assessment

Score your sprawl.

Six statements. Two minutes. An honest view of where you stand.

Rate each statement from 1 (never true) to 5 (always true). Your score adds up as you go.

1 never · 5 always
06
Chapter 6 | The playbook

Reclaim before you buy.

Four steps. The first three make you lean. The fourth keeps you there.

Step 1

Connect

Point Diskover at your storage. Distributed indexers read metadata from each system you choose: SMB, NFS, S3, Azure Blob, tape, and archive. Nothing is copied or moved to get started.

You get

One inventory of what you own, across every tier and site.

Ask yourself

Which systems hold the most capacity, and which ones no one has looked at in years?

Step 2

Catalog

Every file lands in one searchable catalog with rich metadata, such as owner, size, location, last modified date, and last access date. Plugins add business context from the systems you already run.

You get

A price on every share, project, and team.

Ask yourself

Which teams or projects drive the largest share of your storage bill?

Step 3

Curate

Rank what is duplicate, stale, orphaned, or abandoned by what it costs to keep. Decide what stays, what moves to a cheaper tier, and what retires. Teams connect their own AI tools through the AI Connector, ask questions in plain language, and get suggested tags and next steps. Tags apply only after a person approves them.

You get

A sized list of candidates, largest and most expensive first, with the evidence for each decision.

Ask yourself

Who needs to approve each type of decision, and what proof will they ask for?

Step 4

Activate

Turn each decision into a standing rule. Files move, tier, retain, or clear on the schedule you set, and the catalog records what happened and when.

You get

Savings that keep going, and an audit trail you did not have to build.

Ask yourself

Which cleanup did you do once that should now run on its own?

This is not a crash diet

A one-time cleanup helps once. Data keeps arriving, so the waste grows back unless the rule keeps running. Policy is what turns a project into a habit.

07
Chapter 7 | Proof

What good looks like.

Results from organizations that chose to manage their data instead of buying around it.

30% to 50%
of storage reclaimed by tiering and removing ROT
3 to 6 months
to recover the investment after deployment
30+ hours
a week returned to data teams from manual housekeeping

$180B entertainment leader

260 PBindexed across 100B+ files
8 PBreclaimed across 6 data centers
$10Msaved, plus more than $20M in capital spend avoided

Life science research institute

4.7 PBresearch storage estate indexed
0.5 PBof temporary and training data reclaimed
$542Kreclaimed within days, and $250K in overspend avoided

Major global energy company

30%of active storage surfaced as reclaimable
$1.5Min storage savings

Global advertising holding company

39%of 1.6 PB of Amazon S3 storage identified as ROT
$172Ka year, recoverable immediately

Fortune 500 semiconductor company

1.9 PBof abandoned and ephemeral data surfaced, including files from departed employees. Cleanup then automated.

$314B semiconductor company

100+ PBindexed across 103B+ files
$250Ka year saved through automated cleanup policies
The pattern

None of these teams started by buying storage. They started by seeing what they had. The savings came from capacity they already owned. Here are 5 steps to reduce storage costs the same way.

Figures reported by Diskover customers. Customer names are not shown.

08
Chapter 8 | Business case

Build the case finance will sign.

During a shortage, reclaim before you buy is a story finance wants to hear. Here is how to tell it.

A one-page outline.

1The cost todayYour yearly total from the worksheet, with the inputs shown.
2The reclaimable shareStart with 30%. Show the tiers and teams where the largest candidates sit.
3The cost of waitingEvery quarter of delay keeps paying for the same files, while new capacity gets more expensive.
4The planA 30-day proof of concept on your own data, then policies for the largest and safest wins first.
5The proofResults from comparable organizations, and the audit trail every action leaves.
6The askBudget, owners, and a date to review the first results.
Tip for the meeting

Lead with the number, not the technology. Finance approves a cost it can see and a plan it can check.

The number finance asks for
3–6 months

Diskover customers typically recover their investment in 3 to 6 months, from reclaimed capacity and time returned to their teams.

Before your proof of concept

0 of 5 ready

Example opening paragraph
“We hold 2 PB across five systems, at a storage cost of $317,375 per PB per year. At least 30% of it has not been opened in years. That is $190,425 a year we pay to keep data no one uses, before we count support, power, admin, or search time. We propose a 30-day proof of concept on our own data to confirm the number, then policies to reclaim it before our next storage purchase.”
09
Chapter 9 | Questions

Questions people ask.

Short answers to the questions storage, IT, and finance teams ask most.

How much storage can you usually reclaim?

Diskover customers reclaim 30% to 50% of their storage by tiering and removing ROT data. Your share depends on how much of your data is old, duplicate, or no longer used. A 30-day proof of concept on part of your own storage gives you a real number.

What is ROT data?

Redundant, obsolete, or trivial data: duplicate copies, outdated versions, and files with no business value, such as temporary files and old logs. A 2016 Veritas study put ROT data at 33% of what organizations store.

Is it safe to move or delete old files?

Start with tiering, not deletion: move cold data to a lower-cost tier, where it stays findable. Delete only under an agreed retention rule, with the owner’s approval, and keep a record of what was removed and why. See defensible deletion.

Why not just buy more storage?

New capacity costs more and takes longer to arrive. Enterprise SSD contract prices rose about 80% in the first quarter of 2026 alone (TrendForce), and nearline hard drive lead times grew to more than 52 weeks. Capacity you reclaim is available this quarter.

How fast does reclaiming storage pay back?

Diskover customers typically recover their investment in 3 to 6 months, from reclaimed capacity and time returned to their teams. Chapter 4 shows how to put a price on your own waste.

Get started

Know what you are paying to store before you pay to store more.

Start with a 30-day proof of concept on your own data, and recover your investment in 3 to 6 months.

Talk to usWeb diskoverdata.comEmail [email protected]Phone (800) 560-5853
Scroll to Top